Oh my, I'm bad at this blogging lark. I've just got back on it because at last we have some stuff going on & taking a look at my last post realised that I never concluded that little chapter in the story of our build.
After much pestering by phone & email the council caved & gave us an answer. Yes, we can build to code 3 with the condition that we do everything we said we would in our letter of appeal. That's fine, we're happy!
First time self builders - on reflection, probably once in a life time only self builders!!
Thursday, 9 August 2012
Thursday, 31 May 2012
Planning Department - A Law unto Themselves
One of our planning conditions was to achieve Code 4 of Sustainable Homes which I won't knock because the intentions are good but there's no differentiating between the solo builder and the developers, we are all treated the same.
Canterbury City Council have a policy of requiring Code 4 where other neighbouring councils ask for Code 3 and some councils don't ask for any. This all works on a points system divided into categories such as energy efficiency, water usage, materials, waste etc etc. We reach Code 4 on many of these areas but when totalled up just come short and in order for us to get all the points required we would have to spend a whole lot of money that we can't afford on a heat pump so we have applied to the council to vary the condition to allow us to build to Code 3.
The decision should have been made yesterday but can we get an answer from the council? For the last few weeks I have been trying to call the case officer for this application & all I ever get is a recorded message saying that she's on extended leave until April - it's now May! When I speak to anyone else at the council they tell me that she is now back at work but on light duties working only Wednesday & Friday mornings so I call every Wednesday & Friday morning & still only get the recorded message... aaaargh!!!!
We are now a day past decision date & are still none the wiser, how is it that they get away with treating people like this? It is so frustrating & inconsiderate. Phew that's better, I've got that off my chest!!
Canterbury City Council have a policy of requiring Code 4 where other neighbouring councils ask for Code 3 and some councils don't ask for any. This all works on a points system divided into categories such as energy efficiency, water usage, materials, waste etc etc. We reach Code 4 on many of these areas but when totalled up just come short and in order for us to get all the points required we would have to spend a whole lot of money that we can't afford on a heat pump so we have applied to the council to vary the condition to allow us to build to Code 3.
The decision should have been made yesterday but can we get an answer from the council? For the last few weeks I have been trying to call the case officer for this application & all I ever get is a recorded message saying that she's on extended leave until April - it's now May! When I speak to anyone else at the council they tell me that she is now back at work but on light duties working only Wednesday & Friday mornings so I call every Wednesday & Friday morning & still only get the recorded message... aaaargh!!!!
We are now a day past decision date & are still none the wiser, how is it that they get away with treating people like this? It is so frustrating & inconsiderate. Phew that's better, I've got that off my chest!!
Sunday, 27 May 2012
Elevations of Property
![]() |
| East and West Elevations |
Thursday, 3 May 2012
Planning Permission Granted!!
Check out the link Oh my this put a smile on our faces!!! And we had no opposition from any local residents so we are very grateful to have such lovely future neighbours!
Click this link to see our conditions (we've been lucky :))
Planning Permission...GRANTED!!!
Click this link to see our conditions (we've been lucky :))
Planning Permission...GRANTED!!!
Updating
We had the joy of getting our planning permission passed in January & I naively thought "hey hey here we go"!!! How wrong I was!
It would appear that we need numerous weeks for every kind of report to be done from surface rainwater run off through thermal calculations to our inside leg measurement before we can go anywhere with this thing. So, to start, we had a 8 hour meeting with our architect, yes 8 whole hours with no food and no break. My head was banging by the time I went home!! Friends have asked me, 'what did you talk about?' and I have to say it's a very difficult question to answer but the honest answer is, every little detail of the build. We probably did an hour on drains..... (I found my mind wandering at this point), they want to know what taps we want, what precise tile we want in the bathroom & so on. This seems far too early to make decisions when all we have is a plot of earth with a shed on it but we're told they need to know all this to prepare the tender documents for the builders. I think my beloved did a good 30 minutes on how he wants the skirting boards to be....(head banging against the table...lol)
Saturday, 25 February 2012
Headaches with Southern Water's Drain
When we bought the plot we knew that a public sewer ran down the East side of the plot near to the boundary and knew that this would affect the build, however, we didn't realise how difficult it would be to talk to someone at Southern Water about it. Infact, it's not possible to talk to anybody at Southern Water!! They use a consultancy called Atkins to deal with these sorts of things who were very vague and non committal.
Before we could take the plans any further we needed to know for definite how close we could build to the drain. Baring in mind that we were told that they need 24 hour access to the drain for checks, maintenance etc it was stunning to find out that they didn't know for sure the diameter of of said drain and without that they couldn't give us an answer. The biggest indignity was that we would have to fork out £850 for them to send a camera down it to find the answer! If the drain was of a larger diameter we would only be able to build 4 metres from it unless we paid for a "build over" whereby they may let us build closer but on the condition we pay a further £850 at the end of the build to make sure that we hadn't damaged the drain & sign something to say we would be responsible for any damage to the drain at a later date.
You can see the line of the drain on the right of the plot with the man hole covers shown with circles. Actually on the ground only 1 man hole cover was exposed.
We had no choice but to pay the fee for them to check the drain which probably took one man half an hour. We were lucky though, the drain was found to not be such a major one and we were granted permission to build 3 metres from the drain. A result but a very expensive one!!
Thursday, 23 February 2012
Catching up....Preliminary Sketches
Am realising it's a very long time since my last post so a little catching up is needed!
A lot has happened but very very slowly....frustrating as we just want to get started. The best day was going back to the architect after leaving him with our brief for some weeks. He produced a very simply drawn plan of his idea but, although simple, he had to talk us through it as it had curved walls, split levels etc so not easy to interpret to the untrained eye!These are the sketches he showed us;
Front & East Elevations
Cross Sections
Plan of ground FloorBasically he's gone for a boat shape (due to Will having spent his whole working life with boats of all different shapes and sizes). When you look down on the plan you can see the curved walls like a hull.
There is a double height hall open to the roof with a glazed metre wide strip that runs over the whole of the house from North to South which should bring in lots of light and warmth from the sun, or "solar gain" as they say in the trade! There is a cloakroom and Utility Room on the same level and a short flight of steps down to living areas and another up to the mezzanine landing.
The living room is off to the left with 2 floor to ceiling windows looking towards the sea and the kitchen to the right. We had made a big thing about the importance of a good sized kitchen & dining area to us and this space should be wonderful. There are 2 steps down to the dining area with a waist height wall dividing the 2 spaces and nearly all the end wall is glass out to the garden and view.
The first floor has a mezzanine landing and a floating bridge across the void to Ruby's room. There are 3 bedrooms each with an ensuite and all interesting in their shape & glazing.
Finally there's a single garage the roof of which extends to the spare bedroom creating a covered outside area.